Havis DS-GTC-402 Owner's Manual Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
www.havis.com 1-800-524-9900
1) Tip the Docking Station to a position that is comfortable to work with.
2) Install all cables that are necessary for computing needs.
3) Use Zip Ties (Hardware Kit Item 1) and the Strain Relief Points on the bottom of
the Docking Station to secure cables and reduce risk of accidental disconnects.
4) Create a service loop with cables to ensure that no tension is on the
connectors and to enable intended motion.
5) Tie off cables onto a stationary part of the mounting system.
6 7
Installation
1) Install the Docking Station to the Motion Device using four (4) M4 x 0.7 x 20mm
long Pan Head Screws (Hardware Kit Item 3), four (4) Split Lock Washers
(Hardware Kit Item 4), and four (4) Washers, M4 (Hardware Kit Item 5).
Torque screws to 20 in-lbs (2.3Nm) ± 10%.
Cable Management
Collect cables and secure
to the mounting system.
(Note: Mounting system not included)
This loop must be large enough
to allow full range of expected
rotation and extension without
stressing connections.
Washer, M4 Lock Washer M4 x 0.7 x 25mm Screw
Typical Motion Device Example
(not included)
Page view 5
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments